Santa Clara Valley Water District

Summary of Measurement Device Data for Water Rights

These data readings are Preliminary. Most data relayed by telemetry have received little or no review. Inaccuracies in the data may be present because of instrument malfunctions and/or physical changes at the measurement site. Subsequent review may result in significant revisions to the data.

Owner: Santa Clara Valley Water District
Water Right ID: A011751
Measurement Device ID: M000973
Station ID: 4007
Station Name: Lexington Reservoir

Updated: 01-05-2025 18:54:21 PST

4007 Lexington Reservoir
Date Time (PST) Measured Value Units Amount Diverted (AF)* Measured Stage or Elevation Units
01/01/2025 12:00:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 12:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 12:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 12:45:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 01:00:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 01:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 01:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 01:45:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 02:00:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 02:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 02:30:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 02:45:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 03:00:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 03:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 03:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 03:45:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 04:00:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 04:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 04:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 04:45:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 05:00:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 05:15:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 05:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 05:45:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 06:00:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 06:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 06:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 06:45:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 07:00:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 07:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 07:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 07:45:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 08:00:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 08:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 08:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 08:45:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 09:00:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 09:15:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 09:30:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 09:45:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:00:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:15:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:30:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:45:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 11:00:00 AM 8,094.9 acre-feet 618.54 ft
01/01/2025 11:15:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 11:30:00 AM 8,089.8 acre-feet 618.52 ft
01/01/2025 11:45:00 AM 8,092.4 acre-feet 618.53 ft
01/01/2025 12:00:00 PM 8,094.9 acre-feet 618.54 ft
01/01/2025 12:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 12:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 12:45:00 PM 8,094.9 acre-feet 618.54 ft
01/01/2025 01:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 01:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 01:30:00 PM 8,094.9 acre-feet 618.54 ft
01/01/2025 01:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 02:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 02:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 02:30:00 PM 8,094.9 acre-feet 618.54 ft
01/01/2025 02:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 03:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 03:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 03:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 03:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 04:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 04:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 04:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 04:45:00 PM 8,089.8 acre-feet 618.52 ft
01/01/2025 05:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 05:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 05:30:00 PM 8,089.8 acre-feet 618.52 ft
01/01/2025 05:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 06:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 06:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 06:30:00 PM 8,089.8 acre-feet 618.52 ft
01/01/2025 06:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 07:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 07:15:00 PM 8,089.8 acre-feet 618.52 ft
01/01/2025 07:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 07:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 08:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 08:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 08:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 08:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 09:00:00 PM 8,089.8 acre-feet 618.52 ft
01/01/2025 09:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 09:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 09:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 10:45:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 11:00:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 11:15:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 11:30:00 PM 8,092.4 acre-feet 618.53 ft
01/01/2025 11:45:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 12:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 12:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 12:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 12:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 01:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 01:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 01:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 01:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 02:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 02:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 02:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 02:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 03:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 03:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 03:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 03:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 04:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 04:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 04:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 04:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 05:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 05:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 05:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 05:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 06:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 06:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 06:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 06:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 07:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 07:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 07:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 07:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 08:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 08:15:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 08:30:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 08:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 09:00:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 09:15:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 09:30:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 09:45:00 AM 8,092.4 acre-feet 618.53 ft
01/02/2025 10:00:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 10:15:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 10:30:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 10:45:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 11:00:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 11:15:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 11:30:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 11:45:00 AM 8,094.9 acre-feet 618.54 ft
01/02/2025 12:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 12:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 12:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 12:45:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 01:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 01:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 01:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 01:45:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 02:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 02:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 02:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 02:45:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 03:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 03:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 03:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 03:45:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 04:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 04:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 04:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 04:45:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 05:00:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 05:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 05:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 05:45:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 06:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 06:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 06:30:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 06:45:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 07:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 07:15:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 07:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 07:45:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 08:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 08:15:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 08:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 08:45:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 09:00:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 09:15:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 09:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 09:45:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 10:00:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 10:15:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 10:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 10:45:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 11:00:00 PM 8,092.4 acre-feet 618.53 ft
01/02/2025 11:15:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 11:30:00 PM 8,094.9 acre-feet 618.54 ft
01/02/2025 11:45:00 PM 8,092.4 acre-feet 618.53 ft
01/03/2025 12:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 12:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 12:30:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 12:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 01:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 01:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 01:30:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 01:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 02:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 02:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 02:30:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 02:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 03:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 03:15:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 03:30:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 03:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 04:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 04:15:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 04:30:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 04:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 05:00:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 05:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 05:30:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 05:45:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 06:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 06:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 06:30:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 06:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 07:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 07:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 07:30:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 07:45:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 08:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 08:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 08:30:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 08:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 09:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 09:15:00 AM 8,092.4 acre-feet 618.53 ft
01/03/2025 09:30:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 09:45:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 10:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 10:15:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 10:30:00 AM 8,097.5 acre-feet 618.55 ft
01/03/2025 10:45:00 AM 8,097.5 acre-feet 618.55 ft
01/03/2025 11:00:00 AM 8,094.9 acre-feet 618.54 ft
01/03/2025 11:15:00 AM 8,097.5 acre-feet 618.55 ft
01/03/2025 11:30:00 AM 8,097.5 acre-feet 618.55 ft
01/03/2025 11:45:00 AM 8,097.5 acre-feet 618.55 ft
01/03/2025 12:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 12:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 12:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 12:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 01:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 01:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 01:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 01:45:00 PM 8,100.1 acre-feet 618.56 ft
01/03/2025 02:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 02:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 02:30:00 PM 8,100.1 acre-feet 618.56 ft
01/03/2025 02:45:00 PM 8,100.1 acre-feet 618.56 ft
01/03/2025 03:00:00 PM 8,100.1 acre-feet 618.56 ft
01/03/2025 03:15:00 PM 8,100.1 acre-feet 618.56 ft
01/03/2025 03:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 03:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 04:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 04:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 04:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 04:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 05:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 05:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 05:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 05:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 06:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 06:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 06:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 06:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 07:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 07:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 07:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 07:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 08:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 08:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 08:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 08:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 09:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 09:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 09:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 09:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 10:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 10:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 10:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 10:45:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 11:00:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 11:15:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 11:30:00 PM 8,097.5 acre-feet 618.55 ft
01/03/2025 11:45:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 12:00:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 12:15:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 12:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 12:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 01:00:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 01:15:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 01:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 01:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 02:00:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 02:15:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 02:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 02:45:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 03:00:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 03:15:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 03:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 03:45:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 04:00:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 04:15:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 04:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 04:45:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 05:00:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 05:15:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 05:30:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 05:45:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 06:00:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 06:15:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 06:30:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 06:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 07:00:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 07:15:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 07:30:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 07:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 08:00:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 08:15:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 08:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 08:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 09:00:00 AM 8,094.9 acre-feet 618.54 ft
01/04/2025 09:15:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 09:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 09:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 10:00:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 10:15:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 10:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 10:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 11:00:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 11:15:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 11:30:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 11:45:00 AM 8,097.5 acre-feet 618.55 ft
01/04/2025 12:00:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 12:15:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 12:30:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 12:45:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 01:00:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 01:15:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 01:30:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 01:45:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 02:00:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 02:15:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 02:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 02:45:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 03:00:00 PM 8,097.5 acre-feet 618.55 ft
01/04/2025 03:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 03:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 03:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 04:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 04:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 04:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 04:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 05:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 05:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 05:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 05:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 06:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 06:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 06:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 06:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 07:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 07:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 07:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 07:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 08:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 08:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 08:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 08:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 09:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 09:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 09:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 09:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 10:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 10:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 10:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 10:45:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 11:00:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 11:15:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 11:30:00 PM 8,094.9 acre-feet 618.54 ft
01/04/2025 11:45:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 12:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 12:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 12:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 12:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 01:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 01:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 01:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 01:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:45:00 AM 8,092.4 acre-feet 618.53 ft
01/05/2025 06:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 06:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 06:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 06:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 07:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 07:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 07:30:00 AM 8,092.4 acre-feet 618.53 ft
01/05/2025 07:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 08:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 08:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 08:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 08:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 09:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 09:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 09:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 09:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 10:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 10:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 10:30:00 AM 8,097.5 acre-feet 618.55 ft
01/05/2025 10:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 11:00:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 11:15:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 11:30:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 11:45:00 AM 8,094.9 acre-feet 618.54 ft
01/05/2025 12:00:00 PM 8,097.5 acre-feet 618.55 ft
01/05/2025 12:15:00 PM 8,097.5 acre-feet 618.55 ft
01/05/2025 12:30:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 12:45:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 01:00:00 PM 8,097.5 acre-feet 618.55 ft
01/05/2025 01:15:00 PM 8,097.5 acre-feet 618.55 ft
01/05/2025 01:30:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 01:45:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:00:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:15:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:30:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 02:45:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:00:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:15:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:30:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 03:45:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:00:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:15:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:30:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 04:45:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:00:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:15:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:30:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 05:45:00 PM 8,092.4 acre-feet 618.53 ft
01/05/2025 06:00:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 06:15:00 PM 8,094.9 acre-feet 618.54 ft
01/05/2025 06:30:00 PM 8,092.4 acre-feet 618.53 ft
* Due to the complex nature of calculating the amount diverted for each water right, which involves multiple devices and data that need verification later in the year, a Measurement Method is used to quantify the amount of water diverted under all separate priorities of rights being exercised pursuant to California Code of Regulations, Title 23, Division 3, Chapter 2.8, Section 934. The amount diverted during the year will be reported in the annual Report of Licensee for each separate water right.
The conversion method to determine volume of water passing through a measurement device varies based on the type of device used. A stream gauge measures stage (in feet), converted to discharge (cubic feet per second) using a rating table, which is then converted to volume based on the use of conversion factors and duration of flow. A reservoir gauge measures water level elevation in the reservoir, which is then converted to volume using a depth-capacity rating table. Many meters record analog readings that are converted to discharge (cubic feet per second), which is then converted to volume based on the use of conversion factors and duration of flow.

Back to Top


Santa Clara Valley Water District (Valley Water) has created this website to comply with Section 933(b)(4) of California Code of Regulations, Title 23, Division 3., Chapter 2.8, which was an outcome of California Senate Bill No. 88 (SB-88).